GOOD CATCH OF THE WEEK
After our team at the Millinocket ED Expansion project received a delivery of Garlock rails and bases, a TM noticed that several of the rails were damaged. The TM did not install the damaged rails and, instead, red-tagged them and kept them out of service.
Remaining diligent and focused can save lives—let's keep up the great work!
Move Your Way: Small Steps, Big Benefits
🚶♂️Just 150 min/week of moderate activity boosts mood, sleep, focus, and lowers stress. 🏋️♀️Add 2 days/week of muscle-strengthening (e.g., lifting, squats). 🕒 Short on time? Even 5 minutes helps—it all adds up. 🗣️ Gauge your activity with the “talk test”: • Talk easily = moderate intensity • Hard to speak = vigorous 🚴♂️ Everyday movement counts—find what works for you. 🥾Physical activity helps control weight, blood pressure, and reduce disease risk.
So get out there, and make some moves!
BUILDING THE FUTURE
Our Next Chapter
As we enter this next phase, we reflect on where we started, the significant advances we have made, and look toward the exciting growth and continued company strength that will catapult us into a future focused on our people, pride, and progress.
Our people have always been at the heart of what we do, and together, we will continue building on our strengths while supporting one another. Our recent organizational changes on the following slides reflect this commitment.
BUILDING THE FUTURE
Kevin Chronley
Focusing on Strategic Planning and TM Development.
Charlie Cianchette
A/Z President to guide us through this next phase.
Adam Duczynski
Leading Operations in CT/RI/NJ and overseeing Procurement.
Mack Susi
Leading Operations in ME/MA/NH and overseeing Project Controls.
Evolving Our Leadership Structure
Brian Baril
Overseeing Preconstruction & Estimating.
Christopher J. Sharkey
Adding growth of MA Self-Perform to regional responsibilities.
Steve Johnston
Focusing on growth for Self-Perform Operations.
Stephanie Bower
Leading Business Development across multiple regions.
BUILDING THE FUTURE
Evolving Our Leadership Structure
MARKING MILESTONES
Last week, we honored team members marking 5, 10, 15, 20, and 25 years of incredible contributions. Their passion, commitment, and teamwork continue to shape our success.
NEW PROJECT STARTS HIGHLIGHTS
Dry Storage Building
National Grid | Sterling, MA
A new 20,000 SF material storage facility, to service the growth of NG's Transmission group.
L+M Pharmacy Carousel
Yale New Haven Health | New London, CT
Pharmacy renovations to support installation of 2 new carousel units for storage/retrieval of medications.
Heights Res Indoor AQ1
Colby College | Waterville, ME
Indoor Air Quality/HVAC upgrades to Hillside residences.
B90 PCMM Packing Pod
Pfizer | Groton, CT
Installation of a new electrical substation in B90 to support the Packing Pod project.
WELCOMING NEW TEAM MEMBERS
Project Engineer Maine Region Falmouth, ME
Financial Analyst Finance Marlborough, MA
WELCOMING SUMMER INTERNS
Intern Maine Region Falmouth, ME
Intern Construction Management Hartford, CT
Intern Procurement North Stonington, CT
WELCOMING SUMMER INTERNS
Intern Finance North Stonington, CT
Intern Massachusetts Region Marlborough, MA
Intern Safety Marlborough, MA
STARCON SAFETY FLASH
Incident
A subcontractor was injured when a heavy bag of wet perlite (80–100 lbs) dropped during a rope lowering on site in Taylor, Texas. The rope struck his hand, causing injury.
Hand Injury During Bag Lowering
Root Causes
Actions Taken
• Wet rope reduced grip • Miscommunication on elevation • No crane support (off-rent) • Inadequate gloves • Permit and JSA not updated
• Safety stand-down held • Rope use restricted to canvas bags • Reinforced PPE policy • Hand protection assessment scheduled