Project Details

  • Client

    Cytec Industries
  • Service

    Fabrication, Self-Perform
  • Location

    Wallingford, CT

Cytec engaged A/Z to provide the prefabrication and installation of three-inch S.S. vent lines to replace the existing two-inch vent lines on three tanks. The scope of work was completed during a plant shutdown.