Project Details
-
Client
Cytec Industries -
Service
Fabrication, Self-Perform -
Location
Wallingford, CT
Cytec engaged A/Z to provide the prefabrication and installation of three-inch S.S. vent lines to replace the existing two-inch vent lines on three tanks. The scope of work was completed during a plant shutdown.